House construction cost calculator

Put in the area, the floors and the finish. You get the rate, the split and the material.

Sets a starting rate. You can type your own below.

Finish
More options

Leave blank to use Rs. 1,420 before the finish multiplier.

Only splits the total into material and labour. It does not change it.

Advanced settings

Finish multipliers

Floor multipliers

Cost shares

Re-scaled to add up to 100% when you save.

Lump sums

Reset to defaults
Start over

Estimated cost to build

Rs. 1,24,29,657.60

Rs. 1,652.88 per sq.ft · 7,520 sq.ft built-up · Standard finish

Material

Rs. 97,97,657.60

Labour

Rs. 26,32,000

Floor by floor

Level Area Rate factor Cost
Ground floor 1,880 sq.ft ×1.00 Rs. 32,03,520
First floor 1,880 sq.ft ×0.95 Rs. 30,43,344
Second floor 1,880 sq.ft ×0.95 Rs. 30,43,344
Third floor 1,880 sq.ft ×0.98 Rs. 31,39,449.60
Total Rs. 1,24,29,657.60

Where the money goes

Across the built work — Rs. 1,24,29,657.60. Lump sums like a lift or a borewell are listed above instead.

  • Cement Rs. 19,88,745.22 16%
  • Steel (TMT) Rs. 17,40,152.06 14%
  • Sand Rs. 9,94,372.61 8%
  • Aggregate Rs. 7,45,779.46 6%
  • Bricks / blocks Rs. 12,42,965.76 10%
  • Doors, windows and fittings Rs. 18,64,448.64 15%
  • Flooring, plaster and paint Rs. 18,64,448.64 15%
  • Electrical Rs. 9,94,372.61 8%
  • Plumbing and sanitary Rs. 9,94,372.61 8%

Rates in this district run from Rs. 1,420 to Rs. 2,556 per sq.ft depending on the finish. Yours is Rs. 1,704.

Roughly what it takes

Site thumb rules on 7,520 sq.ft. Useful for checking a supplier's bill, not for ordering against.

3,008 bags

Cement

30,080 kg

Steel (TMT)

13,536 cft

Sand

10,152 cft

Aggregate

60,160 nos

Bricks

This is an estimate, not a quotation. It is worked out from Rs. 1,420 per sq.ft ×1.20 for standard finish. Soil, access, the shape of the plot and the market that month all move the real figure. Send it to us and we will price your actual plot.