Budget
House construction cost calculator
Put in the area, the floors and the finish. You get the rate, the split and the material.
Estimated cost to build
Rs. 42,17,400
Rs. 1,704 per sq.ft · 2,475 sq.ft built-up · Standard finish
Material
Rs. 33,51,150
Labour
Rs. 8,66,250
Floor by floor
| Level | Area | Rate factor | Cost |
|---|---|---|---|
| Ground floor | 2,475 sq.ft | ×1.00 | Rs. 42,17,400 |
| Total | Rs. 42,17,400 | ||
Where the money goes
Across the built work — Rs. 42,17,400. Lump sums like a lift or a borewell are listed above instead.
- Cement Rs. 6,74,784 16%
- Steel (TMT) Rs. 5,90,436 14%
- Sand Rs. 3,37,392 8%
- Aggregate Rs. 2,53,044 6%
- Bricks / blocks Rs. 4,21,740 10%
- Doors, windows and fittings Rs. 6,32,610 15%
- Flooring, plaster and paint Rs. 6,32,610 15%
- Electrical Rs. 3,37,392 8%
- Plumbing and sanitary Rs. 3,37,392 8%
Rates in this district run from Rs. 1,420 to Rs. 2,556 per sq.ft depending on the finish. Yours is Rs. 1,704.
Roughly what it takes
Site thumb rules on 2,475 sq.ft. Useful for checking a supplier's bill, not for ordering against.
990 bags
Cement
9,900 kg
Steel (TMT)
4,455 cft
Sand
3,341.25 cft
Aggregate
19,800 nos
Bricks
This is an estimate, not a quotation. It is worked out from Rs. 1,420 per sq.ft ×1.20 for standard finish. Soil, access, the shape of the plot and the market that month all move the real figure. Send it to us and we will price your actual plot.