Budget
House construction cost calculator
Put in the area, the floors and the finish. You get the rate, the split and the material.
Estimated cost to build
Rs. 10,46,682
Rs. 1,661.40 per sq.ft · 630 sq.ft built-up · Standard finish
Material
Rs. 8,26,182
Labour
Rs. 2,20,500
Floor by floor
| Level | Area | Rate factor | Cost |
|---|---|---|---|
| Ground floor | 315 sq.ft | ×1.00 | Rs. 5,36,760 |
| First floor | 315 sq.ft | ×0.95 | Rs. 5,09,922 |
| Total | Rs. 10,46,682 | ||
Where the money goes
Across the built work — Rs. 10,46,682. Lump sums like a lift or a borewell are listed above instead.
- Cement Rs. 1,67,469.12 16%
- Steel (TMT) Rs. 1,46,535.48 14%
- Sand Rs. 83,734.56 8%
- Aggregate Rs. 62,800.92 6%
- Bricks / blocks Rs. 1,04,668.20 10%
- Doors, windows and fittings Rs. 1,57,002.30 15%
- Flooring, plaster and paint Rs. 1,57,002.30 15%
- Electrical Rs. 83,734.56 8%
- Plumbing and sanitary Rs. 83,734.56 8%
Rates in this district run from Rs. 1,420 to Rs. 2,556 per sq.ft depending on the finish. Yours is Rs. 1,704.
Roughly what it takes
Site thumb rules on 630 sq.ft. Useful for checking a supplier's bill, not for ordering against.
252 bags
Cement
2,520 kg
Steel (TMT)
1,134 cft
Sand
850.50 cft
Aggregate
5,040 nos
Bricks
This is an estimate, not a quotation. It is worked out from Rs. 1,420 per sq.ft ×1.20 for standard finish. Soil, access, the shape of the plot and the market that month all move the real figure. Send it to us and we will price your actual plot.